Larsen & Toubro nets water pipeline, pump house construction orders in India
The water infrastructure order was secured from a customer in the United Arab Emirate and includes the execution of a recycled water transmission pipeline project.
The scope of this contract include engineering, procurement, construction and commissioning of 87km of recycled water pipelines, with associated civil works, TSE reservoirs, micro tunnelling works, structural, electrical and instrumentation works.
L&T also secured an EPC order from National Mineral Development Corporation for the construction of a pump house for slurry and water pipeline systems. The scope includes supply of PD pumps and slurry charge pumps, as well as construction of the pump house and associated facilities at Bacheli, Dantewada District, Chhattisgarh in India.
A further order has been secured from Pune Metropolitan Region Development Authority (PMRDA) for the “design and construction of infrastructure works for roads, drains, culverts, potable and recycle water supply systems, a sewerage system and power systems for a hi-tech township at Mahalunge, Pune”. This is expected to be the first project developed under the Town Planning Scheme by PMRDA.