ExxonMobil moves forward with oil and gas project
The company’s fourth, and largest, project in the Stabroek Block is expected to produce approximately 250,000 bpd starting in 2025.
“Yellowtail’s development further demonstrates the successful partnership between ExxonMobil and Guyana, and helps provide the world with another reliable source of energy to meet future demand and ensure a secure energy transition,” said Liam Mallon, president of ExxonMobil Upstream Company. “We are working to maximize benefits for the people of Guyana and increase global supplies through safe and responsible development on an accelerated schedule.”
Yellowtail production from the ONE GUYANA floating production storage and offloading (FPSO) vessel will develop an estimated resource of more than 900 million barrels of oil. The $10 billion (€9.2 billion) project will include six drill centres and up to 26 production and 25 injection wells.
ExxonMobil’s ongoing offshore exploration in Guyana has discovered a recoverable resource of more than 10 billion oil-equivalent barrels. The company anticipates up to 10 projects on the Stabroek Block to develop this resource.
ExxonMobil affiliate Esso Exploration and Production Guyana Limited is operator and holds 45% interest in the Stabroek Block. Hess Guyana Exploration Ltd. holds 30% interest and CNOOC Petroleum Guyana Limited holds 25% interest.